SUPER RESUME
< Back
Edit this resume to make it your own!

Your Name

ARCHITECT

Chevy Chase, MD

your.email@example.com
111-222-3333
www.your-website.com

Summary

Experience Summary: 
I have over 21 years of experience in architectural design and project coordination, and experience in both new site development and existing project renovation. Direct hands–on experience in completed Space Programming and Design Concept Documents, Demonstrated direct experience with clients and evidence of skills formulating and developing concepts with clients individually and in groups is a requirement, and I have broad experience on varying projects and have the ability to organize client’s ideas and requirements utilizing a process to produce a final summary of concepts and space requirements.  
Individual will have organizational skills combined with the ability to quickly sketch concepts and diagrams to transform client ideas from abstract to concept and then to graphical and written solutions. I have experience in leading a CAD team and other architects and coordinating with other engineering disciplines. My experience includes coordinating client reviews and peer reviews with English (United States) based staff. I am fully committed to providing excellent client service.

Work Experience

ARCHITECT

SYMEX HEALTHCARE CORPORATION,

Jan 2011Dec 2012

Project implemented for- Diagnose Clinic, and Heritage Building
Responsibilities included:
  • Designing Project DX Clinic complex of offices, MAMO, MRI, Stress testing, ICU, C.T. Scan , Ultrasound Cardiac , Endoscopy Ultrasound, General Therapeutic Ultrasound, E.K.G. , X Ray, Fluoroscopy. The building G+3 level with an area of 6,567sq m (70,686.6sq ft).
  • Heritage Building -clinic G+1 with an area of 264 sq m (2833,85sq ft), including different departments, preparing architectural drawings, and construction phase services for the project

Associated Engineer Architect / PARSONS INFRASTRUCTURAL &TECHNOLOGY

VA Medical Center in Florida, Washington, DC

Jun 2010May 2011

D.C.
Project implemented for - VA Medical Center in Florida -Orlando
Responsibilities included
  • Developed and Maintain Commissioning Elapsed Time Schedule and update Commissioning Building and infrastructure plan VA Medical Center in Florida -Orlando. Prepare FPTs commissioning review of submittals VA Medical Center in Florida -Orlando. The new Orlando VA Medical Center will be located on a 65-acre campus in southeast Orange County. The 1.2 million square foot facility will cost $665 million to construct. The medical center will have a large multi specialty outpatient clinic, 134-inpatient beds, 120-community living center beds, a 60-bed domiciliary and administrative and support services

Project implemented for -GSA
  • Manage inspection and acceptance of all work. Conducted routine inspections, reviewed special inspection reports, schedules, coordinates, and conducts pre-final and final inspections, prepared and distributed punch-lists and monitored punch-list completion for 22 building in Washington DC.
  • Review project design packages using, Specifications are project-specific. LEED criteria are incorporated into the designs of all facilities.
1. Using a PRMA roofing system with either a paver system or vegetative roof as required, roofing materials, install new insulation as required to achieve an R-50 insulation value. Install new Energy Star® rated TPO membrane roofing system with a minimum SRI of 78.
2. Install a photovoltaic system.

Design Manager

PARSONS INTERNATIONAL LIMITED, Abu Dhabi

Nov 2009May 2010

Abu Dhabi Wasat Al-Madina Block Revitalization Program (E3-2) Initiated by ADM/UPC - UAE
Responsibilities included
Developed and Completed Report including the existing condition with baseline evaluation and providing the consultancy services for development of Wasat Al- Madina Sector E3-2 as per Trip contract with UPC and ADM.
Project implemented for- Musanada - IMPACT
Responsibilities included:
  • Developed Space Programming and Design Concept documents, and preparing RFP. Demonstrated direct experience with clients and evidence of skills formulating and developing concepts with clients individually and in groups is a requirement.
  • CV04 - National Réhabilitation Center - total cost 250, 000, 00 DHS
  • CV15 - Women's Association Branch - total cost 24, 750, 00 DHS
  • CV18 - Economic Department Office l- total cost 250, 000, 00 DHS
  • CV25 - National Consulting Council Office - total cost 175, 000, 00 DHS
  • CV27 -Covered Sport Hall for Baniyas Sport Club - total cost 50, 000, 00 DHS

Senior Project Architect

PARSONS INTERNATIONAL LIMITED, Dubai

Nov 2006May 2009

Dubai

Project implemented for- Emaar Properties PJSC

Project: Infrastructure works, DB of Mohammed Bin Rashid Housing Program, National Housing Project, in Dubai-United Arab Emirate

Responsibilities included
  • Reporting to design manager for all study and assessment, design, architectural engineering, and construction phase services for the program
  • Completing 2 sites housing project; (1) Al-Warkaa 544 villas with a total cost of $156,244,504 (2) Al -Muteena 940 Villas with a total cost of $30,844,717,871.The team includes architects, infrastructure teams, engineers , O&M , safety professionals and inspectors, subcontractor and labor force.

Consultant Architect / AREX CONSULTAN

Dubai Project, Dubai

Jul 2006Nov 2006

implemented for-Office Building IMPZ
Responsibilities included:
  • Designing Project IMPZ - DUBAI PROPERTIES complex of 8 offices for media industry. The 8 buildings started from G+6, toG+3 level with an area of 15,350sq m (165,227.4sq ft)
  • Shopping center G+1 with an area of 48,605 sq m (523,184.22sq ft), including different departments, preparing architectural drawings, and construction phase services for the project

Consultant & Project Architect / PARSONS -BHE CONSULTANT U.S.A

USAID Buildings, Healthcare, Ministry of Industry and Education,

Jun 2004Apr 2006

Project implemented for- USAID Buildings, Healthcare, Ministry of Industry and Education (BHE)
Responsibilities included:
  • Reporting to design manager for all study and assessment, design, architectural engineering, and construction phases' services for the program
  • Responsible for 140 different new construction clinic sites, 20 hospital renovation sites and 3 ministry locations. The team included 450 Iraqi architects, engineers, safety professionals and inspectors. Subcontractor labor force exceeded 6,000 persons
  • Responsible for 20 hospital renovation projects, including coordination of all design disciplines, client reviews and responses to comment packages.
Other Experience

Consultant and Architect / ENGINEER PROGRAM ASSESTANT / GRANTS

USAID- Revitalization of Iraqi Schools and Stabilization of Education Program,

2003 2004

DEPT. FOR CREATIV ASSOCIATES

Project implemented for -USAID- Revitalization of Iraqi Schools and Stabilization of Education Program.
As part of post war reconstruction program, renovated the schools to be suitable for study. My responsibilities included:
  • Prepared the BOQ for rehabilitation of 200 schools .Every school has 600-1200 students and an average cost of $30,000
  • Assessed all needs of constructional materials and collected information from suppliers and contractors pertaining to the latest technologies and materials prices available in markets
  • Arranged site visits to supervise the rehabilitation of schools
  • Coordinated with program manager and engineering department of the Ministry of Education
  • Coordinated with engineers, contractors and site engineers

Consultant and Architect / OFFICIAL ENGINEERING AUTHORITIES

OFFICIAL ENGINEERING AUTHORITIES, Baghdad

2001 2003

Project implemented for -Iraqi Government -Al -Rahman Mosque project
  • Prepared design and working drawings for house of worship serving 15,000 person .The plot area is 512,000 sq m (551,111,68sq ft), and the built up area is 42,767 sq. m (460,343,988sq ft)
  • Assessed all needs for constructional materials and collected information from suppliers and contractors pertaining to the latest technologies and materials prices available in markets
  • Arranged site visits to supervise the project on site
  • Coordinated with engineers from other departments including structural, mechanical, electrical, and civil engineers
  • Implemented drawings using Auto CAD program

Architect

Architecture / NAJIB KHARRUFA BUREAU OF CONTEMPRARY DESIGN, Baghdad

1995 2000

20 houses in Baghdad
  • Prepared preliminary design sketches for houses and presentation drawing.
  • Implemented tender and drawings using Auto CAD program.
  • Coordinated with engineers and architects and satisfied with all clients requirement.

Arhcitect

RIAD AL-AUBAIDI CONTRACTING BUREAU, Baghdad

Sep 1986Nov 1995

CONSTRUCTING BUREAU - Baghdad
1986 to 1995
Martyr Monument Prepared design and structural drawing for cladding wall, a16,600 sq m (178682.4 sq ft) wall, using steel structure and facing it by marble & stone contain the name for masteries on the wall)
  • Baquba Chamber of Commerce. (G+4) Each floor had a 400 sq m, built up area, included 200 employees serving marketing and trade clients.
  • Baghdad Chamber of Commerce, (G+2). Each floor had a 1,980 sq m (213.1272 sq ft) built up area
  • Housing project in Faw City in the south of Iraq. The house for the Governor. The plot area is 900 square meters, built up area 600 square meters, and 20 houses for employees. Project included all building services
  • Project (301) VIP Building. Contains conference halls for 300 persons with all services such as translating cabinet ,6 meeting rooms and dining hall with large food services area, the built up area is 5 ,987 sq m the building serving the Ministry of Foreign Affairs
  • Market in Maissan city.G+2 with parking area and playground and green area a total area is about 1200 sq m
  • Al- Mahmoodiya projects. For food industry including food storage and processing meat industry & vegetables, a total area of about 10,000 sq m (10,764sq ft)
  • Rehabilitation of two historical churches in the north of Iraq (Mar Gorges, Mar Bahnam)

Education

B.S. in Architecture

University of Technology, Washington, DC

1986

Skills

Skills: AutoCAD 2D & 3D - 12 years and 3d max of progress experience I have also experience using Sketch Up, Photo Shop, Revit, Illustrator, and In Design to develop 2D/3D models and produce virtual design simulations to integrate collaborative work flow from project team and to identify design conflicts using the intelligence of the software and communicate solutions for design development I have also experience using Microsoft Office.

Additional Information

REFRENCE 
Paul Rich, PE 
PARSONS- Vice President 
202-714-5364 
Paul.Rich@parsons.com 
 
J. Kenneth Hudson, PE 
PARSONS-Project Manager 
Dominican Republic 
US Cell (281) 910-7947 
kennethj.hudson@parsons.com 
www.parsons.com 
 
Larry E. Hartman, PE, MBA 
PARSONS-Vice President 
303-668-3170 
E-mail: larry.hartman@parsons.com
Resume Builder | Resume Templates | Resume Examples | About Us | Privacy Policy | Terms of Use | Help Articles | Contact Us
Super-Resume.com © 2013-2017