Summary

21 Years Piping Designer; 6 years of Alaskan North Slope Drill Rig, Well Pads, Production Facilities, Pipeline & Off-shore Gas Platform with 4 years field experience, 6 Years Refinery, 8 years of other including: Gas Compression, Co-gen & Simple Peaker Power Plants, Process Facilities & Shipbuilding. Produced 3-D Piping, Equipment, Skid packages models, Isometrics, Plans and Process P&IDs in Bentley XM (Rebis-Autoplant) with Acad Versions 9-2010. Other programs include; Tribon 2-D, Quick-pen, Cadworx 3-D, Intergraph 3-D VDS & Calma 3-D PDS. 2005 BE AWARDS OF EXCELLENCE in “Plant Technology for Retrofit” for Veco, Alaska. http://www.nxtbook.com/nxtbooks/bemagazine/supplement05/index.php?startpage=120

Work Experience

Principal Mechanical Piping Designer

Nana Worley Parsons/Systems Research Inc,

Feb 2011Current

for Nana-Worley Parsons at Bp Milne Point, Prudoe Bay Alaska.
  • CHOPS S Pad Corrosion Injection project.
  • Module 58 A2A Option 2 project.
  • B & C pad Chemical lines.
  • Numerous Well Pads RWO and Conversions at Milne Point.

Principal Piping Designer

ARES CORPORATION, Richland, WA

Dec 2010Feb 2011

Hanford Washington-Department of Energy-Office of River Protection
  • Produce layout for Plans, Sections at the Diluent / Flush Pad on AY/AZ Tank Farm Area.

Piping Designer for Conoco-Phillips San Francisco Refinery

ANVIL CORPORATION, Bellingham, WA

Aug 2010Sep 2010

ANVIL CORPORATION
Bellingham, WA 8/2010 to 9/2010
Piping Designer for Conoco-Phillips San Francisco Refinery.
  • Updated piping models, Plans, P&IDs and Isometrics drawings for Area 200 Coker Unit.

Sr. Piping Designer

PARKER DRILLING, INC, North Slope, AK

Apr 2010Aug 2010

Modified P&IDs, Plans, Sections & Isos for Construction on The World's Longest Horizontal Ultra Reach
Drill Rig.
  • Field verification of drawings for construction on Pipe Barn, Drill Module and Drill Service Module.
  • Used Acad 2008 with 2-D Bp Tools.

Sr. Piping Designer

ALASKA ANVIL, INC, Anchorage, AK

Sep 2009Jan 2010

Produced 3-D piping and equipment models, Plans, P&IDs and Isometrics for H2 unit, SRU, Pipe rack and 
Tank Farm areas.

Sr. Piping Designer

ANVIL CORPORATION, Bellingham, WA

Feb 2008Apr 2009

Chevron Salt Lake City STARR project
Produced 3-D piping and equipment models, Plans, P&IDs and Isometrics for TGU, FVR & SWSA plants.
  • Checked equipment and skid packages.

Principal Mechanical Piping Designer

NANA-COLT ENGINEERING, Anchorage, AK

Feb 2006Feb 2008

Conoco-Phillips Kuparuk DS1R & DS2ED WI Pipeline Repair Projects
Principal Piping Designer
  • DS2ED WI On-pad produced 3-D models of Pigging & Receiver Modules to use smart pig skid.
  • DS2ED off-pad & DS1R Pipeline repair, update alignment sheets and use SAP to check in drawings.

Bp MPU-B PAD PIG LAUNCHER MODULE 58 RECEIVER DOUBLE BLOCK VALVE
Lead Piping Designer
  • Produced 3-D Piping & Equipment model.
  • Produced Plans, P&IDs updates & Isometrics Drawings.
  • Field trip to verify dimensions on as built drawings.
Bp MPU-C PAD WAG COMPRESSOR
  • Produced 3-D Piping & Equipment model.
  • Produced Plans, P&ID updates & Isometrics Drawings.
  • Field trip to verify dimensions on as built drawings.
Bp WOA-GC2 SKID 6 V-226 REPLACEMENT
  • Produced 3-D Piping model and Equipment Skid.
  • Produced Plans, Sections, Isometrics and update Process P&IDs drawings.
  • Field trip to verify dimensions, obtain photos, gathered data and information from Facility Engineer to as-built existing tank.
Bp WOA-GC2 SKID 6 BOILER BLOWDOWN DRAIN TANK
  • Produced 3-D Piping model of existing Boiler and new tank.
  • Produced Plans, Sections, Isometrics and updated Process P&ID drawings.
  • Field trip to verify dimensions on as built drawings.
Bp EOA-CCP Module 4918
  • Produced 3-D Piping model.
  • Produced Plans, Isometrics and updated Process P&ID drawings.
  • Field trip to verify dimensions on as built drawings.
Bp WOA-GC2 SKID 40 FLARE UPGRADE PHASE 1
  • Produced 3-D Piping model.
  • Produced Plans, Sections, Isometrics and updated Process P&ID drawings.
  • Field trip to verify dimensions on as built drawings.

Pioneer Natural Resources-OOOGURUK DEVELOPMENT ONSHORE PIPELINE Project
Principal Piping Designer
  • Produced 3-D Piping model & Produced Plans, Sections, Isometrics and updated P&ID drawings.

Bp OT/OTL FS2 Facility Revamp Project
Principal Piping Designer
  • Produced 3-D Piping, Equipment & Structural model for FS2.

Sr. Pipe Designer & Alternate Lead

VECO-ALASKA, INC, Anchorage, AK

Feb 2004Feb 2006

BP Slug Catcher Debottle Necking Project, Milne Point
Sr. Pipe Designer
  • Produced 3-D model of Module 54 at Milne Point.
  • Produced Plans, Sections, Isometrics Drawings.
  • Field trip to verify dimensions on as built drawings.
  • Used BP Documentum Program in order to research drawings.

Conoco-Phillips Alpine, CD3 and CD4 projects
Sr. Pipe Designer & Fill-in Lead
  • Produced 3-D models of ESD, Pigging, Reim and Fuel Gas Conditioning Skid Modules.
  • Led group of 9 designers and go to meetings with PE and PMs as fill in lead as needed.
  • Maintain Status reports; upload SAP, manpower estimates to Planning and to Lead Mechanical Engineer.
  • Produced Plans, Sections, Isometrics and package components for Fabrication and Installation drawings.
Conoco Small Projects Integrated TeamTyonek Platform, Alaska
Sr. Pipe Designer, Fill-in Lead (Auger/Filter, Cartridge Filter, & Coalescing Filter projects)
  • Won the Bentley Systems, Inc. BE Success Award for the 3-D model on the Tyonek Retrofit Project.
  • Routed pipe in congested platform, using Cloud works and Cyra Scanning models.
  • Numerous Field trips to Platform in Cook Inlet.
  • Produced Plans, Isometrics, Sections, updated P&IDs drawings and BOMs.

BP E-Pad Production Optimization Project. (North Slope)
Sr. Pipe Designer, Fill-in Lead & later took over as Lead Designer.
  • Produced Plan, Section, BOMs, Isometric & Process P&ID drawings.
  • Routed 3-D piping systems for inside and outside of module 054, at E-Pad.

Sr. Pipe Designer

NASSCO, San Diego, CA

Jul 2003Dec 2003

NASSCO SHIPYARD, A General Dynamics Company. 7/2003-12/2003
Pipe Designer San Diego, CA
  • Back fix team for BP Oil Tanker for piping systems, equipment skids.
  • Produced sketches Process P&ID revisions and material list for pipe systems, pipe supports, steel and electrical systems. Piping & Metal Outfitting designer for U. S. Navy T-AKE ship.

Education

B.A. in Communications

California State University, Fullerton, CA

Additional Information

EDUCATION & TRAINING
  • TWIC TSA Card for Refinery and ports 2008-2013.
  • N.S.T.C. CARD 2011 /ASH 2010 / Thinking Driver North Slope 2007 / MPU & ENDICOTT Site Training & H2S/Bp
  • LEICA GEOSYSTEMS HDS, Inc SCANNING & CYCLONE 5.1 (Cloud works and Cyra Scanning) TRAINING November 2005
  • BENDER SHIPBUILDING- Rebis 3-D Autoplant 1.0, 1997
  • AVONDALE- Intergraph 3-D VDS, 1996
  • NASSCO Calma 3-D PDS, 1995
  • FLUOR DANIEL Phase I, II, and III Pipe Design, Calma 3-D PDS, and 2-D MICROSTATION, 1991-1994
  • B.A. Communications; Radio/TV/ Film with Management emphasis California State University, Fullerton, CA, January 1989
Resume Builder | Resume Templates | Resume Examples | About Us | Privacy Policy | Terms of Use | Help Articles | Contact Us
Super-Resume.com © 2013-2017