SUPER RESUME
< Back
Edit this resume to make it your own!

Your Name

Sr. Piping Designer

your.email@example.com
111-222-3333
www.your-website.com

Summary

20+ years of continuous working experience as a Sr. Piping Designer in Oil and Gas profession. Experience involved in the engineering design of Greenfield and numerous Brownfield upstream and downstream projects. Gained enough experience in various engineering functions from Front End Engineering & Design (FEED) with major emphasis in executing Detail Design & Engineering (Piping) utilizing relevant piping software. 
Produce the various discipline deliverables to the agreed schedule. Apply recognised onshore and offshore engineering practices applicable to piping design and topside/plant layout. Experience involved Brunei Shell onshore / offshore and other several project in Brunei/Qatar. 
Experienced in Plant Design System - PDS (Piping Modelling) AutoCAD or manual design drafting method, also basically responsible for the preparation of project drawings such as: Plot Plan, Equipment Location Plan, Vendor Drawing, Piping Arrangement Drawings, Pipe Support Drawings and Isometric perspective and material take-off, and fabrication detailed drawings in every projects and to ensure comply with the client approved design standards to provide quality design.

Work Experience

Sr. Piping Designer

Damit WorleyParsons Sdn Bhd,

2004Current

Currently assign checker in Champion Waterflood Project - Brownfield A2 Phase. Perform engineering checking of Advance Tie-Ins, Demolition, and Offshore Works packages based on the site survey report and as received 3D model from the client. Prepare and issue inter discipline squad check and bill of material (BOM) for SAP input. Carry out all offshore field survey for the verification of project scope of works. 
 
Gathers information from all sources required including other disciplines, vendors, engineers, reference drawings and catalogs to produce complete, functional and constructible design packages. Construct scenarios from various information sources to develop details and follow through with solid workable solutions for design problems and to ensure comply with the client approved design standards to provide quality design. 
 
Produce detailed design packages as per Engineering Technical Services Request (ETSR) that are required for the installation, hook-up and commissioning of PIMS West 2004 Pigging Facilities Modifications project. Coordinate or make jobsite visits, as required, to resolve problems and interpret drawings and documents from the existing facilities to new facilities piping routing study drawings and material quantity take-off and as-built drawings. Perform pre-job walks, field walk-downs, field routing of pipes for new Dual Strings Gas Lifted Well (RS-43) at Rasau Wellhead Facilities. 
 
Produced detailed design packages in Brunei Liquefied Natural Gas Sdn Bhd (BLNG). Following projects were involved: Marine Flare Line and Vapour Return Line like for like replacement, Valves Replacement for Train-1 to Train-5, Instrument and Tool Air Line Replacement and 13 and 14 Cell Cooling Water Return Header Replacement. 
Carry out all offshore field survey in numerous platforms in west Ampa-Fairley facilities for the verification of piping general arrangement, Plot Plan and PEFS/UEFS project As-built and general As-built. Check all Review As-Built (RAB) and Issue As-Built deliverable package. 
Checking all general arrangement drawings and sections as per site information for Ampa-Fairley (FAGP-04) platform. Check, back check of AFC and post AFC submit packages of AMDP-25, AMWJ-26, GADP-01 and FACP-04. 
 
Review and check calculations, design models, drawings and design documents prepared by assigned designers or drafters for quality, accuracy, neatness, functionality, and satisfactory completion for a reliable/safe plant operation and construction economy. 
 
Prepare and issue inter discipline squad check of Plot Plan, Piping General Arrangement, 2D Piping Isometrics and all removal drawings. Prepare bill of material (BOM) for SAP input. 
 
Attend and participate in departmental and project meetings.

Sr. Piping Designer

Worley Arabia Co. LTD,

2004 2004

Involves in various detailed design, site survey (offshore) and drafting of all piping in oil and gas project, particularly in Zakum West Supercomplex. Field measure existing equipment and piping assemblies for modifications. Design piping and new equipment installations to fit for quick turnaround installations in existing facilities. Prepared isometric drawings for piping including material take-off. Duties also included checking and back checking of drawings. Assisted design Engineer to gather necessary information from existing drawing needed in the project. Responsible for locating support points on piping arrangement drawings and prepare support style to be used according to standard.

Sr. Piping Designer

Worley Qatar WLL,

2003 2004

Performs manual / computer layouts using specifications, standard drawings, instructions plot plans, line list and supplier information. Develops detailed design project piping models. Prepares piping drawings, isometrics, stress and material sketches. Check, back check, general arrangement drawings and isometric. Communicates and interfaces with other project design and engineering disciplines.

Sr. Piping Designer - Seconded

Maersk Oil Qatar As,

2001 2002

Responsible for the preparation of Piping Drawings: Plot Plan, Equipment Location Plan, Piping Arrangement Drawings, Pipe Support Drawings, and utilizing manual or AUTOCADD drafting methods. Perform site visit to determine interference of new pipe routing with other trades. Conduct field measurement of existing equipment and piping assemblies for the project scope modification.

Sr. Piping Designer

Fluor Daniel Inc,

2001 2001

Philippines 
Performs manual / computer layouts using specifications, standard drawings, instructions plot plans, line list and supplier information. Develops detailed design project piping models. Prepares piping drawings, isometrics, stress and material sketches. Check, back check, and correct assigned piping models, drawings and isometric. Communicates and interfaces with other project design and engineering disciplines. Check other departments design drawing and supplier equipment drawing. Update master flow diagrams and location control plan. Assets / monitor area progress and reports to supervisor as required.

Piping Engineer - Seconded

Sime Sembcorp Engineering Sdn Bhd,

2000 2001

Responsible in the preparation of comprehensive PIPING overall MTO for costing purposes. Prepare piping isometric sketches & layout to capture material requirements as per schematic drawings. Analysed contract documents technicalities to determine client / contractor scope of work. Study technical clarification from client for any material impact. Prepare & transmit letter of communications to Proposal Manager.
Bidding exercised for various projects.
  • Helang Central Platform and topsides resak compression module.
  • E11-RC Riser Platform
  • BR-A CPP for Lundin Malaysia Ltd.
  • MPF for Chevron Offshore (Thailand)

Sr. Piping Designer - Seconded

Kvaerner R.J Brown Pte Ltd,

1999 1999

Assisted and coordinated with the supervisor and design engineer with the ongoing RHOUNE POULANC PHARMACEUTICAL PROJECT. Conduct field surveys for the preparation of working drawings. Prepared piping isometric drawings for as-built works, revisions and tie-in installations.

Sr. Piping Designer

February to August,

1999 1999

Fluor Daniel Inc. Philippines 
Performs manual / computer layouts using specifications standard drawings, design instruction, plot plans, flow diagrams, and line list and supplier information. Develop detail design project piping models. Prepares piping drawings, isometrics, and material take-off. Check, back check and correct assigned piping models, drawings, and isometrics.

Designer Mechanical/Piping

Technip Engineering Brunei,

1996 1998

Involves in various detailed design, site survey (onshore / offshore) and drafting of all mechanical / piping in oil and gas project, particularly in Champion-7 and Seria Refineries. Prepared isometric drawings for piping including material take-off for as-built works, revisions and well tie-in installations. Duties also included checking and back checking of drawings. Assisted design engineer to gather necessary information and existing drawings needed in the project. Following projects were involved:
  • Champion-7 Diesel fuel and fuel supply system upgrade
  • Champion-7 G-110 pipework refurbishment
  • Champion-7 Das replacement project
  • Champion-7 PEFS As-Built
  • Simplification of engineering flow schemes
  • PGWJ-1, Gas well tie-in (Peragam 3)
  • Condensate stabilization plant as-built / data verification
  • Seria crude oil terminal tie-ins
  • Rasau production station / NGCP (as built)

Piping Designer - Seconded

January to August,

1996 1996

to Oil Line Engineering & Associates Sdn Bhd 
 
Coordinates with the Piping section head regarding the piping specification, piping standard and other data references needed in the project. Coordinates with the Structural design engineer regarding the project scope of existing and new structure for the routing of all new piping system. Responsible for the preparation of plan details, elevations, sections and isometric drawings for the draftsman / cad operator.

Piping Designer / Draftsman

Sanko Engineering Corporation,

1995 1996

Coordinates with the supervisor and senior piping engineer regarding the project specifications, piping standard drawing and other data preferences for the completion of all engineering working drawing. Prepares engineering working drawings such as piping arrangement drawings, isometric drawing including material take-off, sections and details for more detail presentation layout. Prepared the necessary shop drawings and details for proper fabrication process and formulates / issue guidelines and fabrication procedures requiring revision and or as-built drawing. Responsible for locating support points on piping arrangement drawings and prepare a support style to be used according to standard.

Line Checker Supervisor

P.T. Nippon Steel Construction Indonesia,

1994 1994

Prepare the test block wise monthly schedule to fulfil the detailed schedule. Conduct line check. Confirm the completion of the remaining works and inform status to the test prepare group. Perform all other required on field assignment.

Mechanical / Piping Draftsman

Sanko Engineering Corporation,

1993 1994

Coordinates with the Supervisor and Senior Piping Engineer / Designer regarding the piping specification. Secondary design work. Gathered project data references needed for the completion of all engineering drawings. Check isometric drawings regarding the indication of joints (welded and screwed) dia-inch computation and exact location of pipe supports as per layout drawings.

Piping Draftsman

Babcock Hitachi Philippines,

1990 1993

Coordinates with the Senior Engineer for the preparation of all engineering working drawings needed for the construction. Gathered project data references needed for the completion of all engineering drawings. Secondary design work. Prepare isometric drawings, as built drawings and revising including material take-off. Handle all drafting works from preliminary to shop fabrication drawings. Provide assistance to fabrication foreman in cutting layout and fit-ups.

Piping Draftsman

Petrochemical Consultant Inc,

1987 1990

Coordinates with the costumer engineers and gathered project data references for the completion of engineering working drawings to conform to the customer requirements and international approved and standards. Prepares engineering working drawings such as isometric drawing and as-built drawings including material take-off. Conduct field survey for checking and discrepancy of the isometric drawing to actual fabrication.

Additional Information

Qualifications: Bachelor of Science in Mechanical Engineering
Resume Builder | Resume Templates | Resume Examples | About Us | Privacy Policy | Terms of Use | Help Articles | Contact Us
Super-Resume.com © 2013-2017