SUPER RESUME
< Back
Edit this resume to make it your own!

Your Name

Civil Engineer

Ladera Ranch, CA

your.email@example.com
111-222-3333
www.your-website.com

Summary

Civil Engineer with over 15 years of working experience in commercial, residential and public works projects. Able to foster and maintain positive working relationships, utilize appropriate business like communication to accomplish job duties. Ability to work cooperatively in a group and demonstrate leadership skills when appropriate. Capable of identifying work related problems, recommend and implement effective solutions. As a leader, can contribute new ideas to improve productivity and efficiency.

Work Experience

Squad Leader

HNTB CORP, Los Angeles, CA

Aug 2009Sep 2012

Served as a drainage lead for this $750 million project that will add a 10-mile HOV lane and improve supporting infrastructure such as ramps, bridges and sound walls on the San Diego Freeway (I-405) while widening lanes and shoulder to full standards from the Santa Monica Freeway (I-10) to Ventura Freeway (U.S. 101).  
 
The scope of drainage work included base design, post design, and material submittal review. Post design work included drainage design to accommodate field conditions and submitted as revisions to RFC’d drainage improvement plans. Squad Leader responsibilities included assigning drainage work to design engineers and reviewing their work for submittals.

PROJECT MANAGER

HDR ENGINEERING INC, Irvine, CA

Feb 2007Aug 2009

Civil design experience includes: precise grading, street improvements, sewer 
improvements, and storm drain improvements for public and private facilities. 
Expertise includes hydraulics and hydrology, and stormwater quality protection. Project Manager responsibilities included assigning project tasks to design engineers and reviewing their work for submittals. 
 
Project: VENTURA COUNTY CALIFORNIA, J STREET DRAIN CHANNEL 
The proposed project is expected to reduce local flooding along the J Street Drain 
During severe storms. A sand berm created by wave action prevents J Street Drain from outletting to the ocean. The resulting backwater reduces the channel capacity. 
The channel's existing capacity was estimated at 500-600 cfs which is equivalent to a 
5-year storm. The scope of work includes engineering design to reconstruct 
approximately 2.2 miles of J Street Drain from its outlet at 
Ormond Beach to Redwood Street in the City of Oxnard, and increase the existing 
channel's capacity. 
 
Project: TRANSPORTATION CORRIDOR AGENCY, TCA 241SB WIDENING 
The project consists of providing a third general purpose lane in the median of the southbound roadway from south of Santa Margarita Parkway (south of Arroyo Trabuco 
Creek Bridge) to north of Bake Parkway. The scope of work included Preparing 
Hydrology/Hydraulic Study Report to determine the adequacy of existing on-site 
drainage systems, installed as part of the original FTC-N construction, to accommodate the proposed widening to ultimate corridor configuration. Proposed drainage system 
improvements consist of modifying existing systems as needed. Drainage 
improvements include relocation of existing DI's, extension of existing pipes, 
connections to existing drainage systems and regarding of the median. In addition, 
asphalt concrete overside drains (ACOD's) and vegetated swales are proposed in areas of superelevation to protect the median from erosion by roadway runoff. 
 
Project: STATE ROUTE SR-57, NORTHBOUND WIDENING PROJECT 
The Department of Transportation- District 12 (Department), in cooperation with Orange 
County Transportation Authority (OCTA), proposes improvements to northbound State 
Route 57 (SR-57), in the City of Anaheim, between 0.31 mile south of Katella Avenue 
(PM 12.2) and 0.31 mile north of Lincoln Avenue (PM 15.2). The scope of drainage 
work included evaluating the capacity of theexisting on-site drainage systems, design 
drainage improvements needed to accommodate the proposed roadway improvements, 
prepare hydrology/Hydraulics report, and prepare a SWDR (Storm Water Data Report 
per Caltrans Requirements) for PA/ED and PS&E phase of the project. 
 
Project: COUNTY OF RIVERSIDE CALIFORNIA, MURRIETA ROAD WIDENING 
PROJECT 
Murrieta Road is a key north-south arterial west of freeway I-215 in the unincorporated 
areas of Sun City and Perris. The proposed project from Ethanac Road to McCall 
Boulevard, which is about two miles (11,000 linear feet) long, will be widened to four 
lanes and will provide much needed street capacity to the community. Prepare 
hydrology study to analyze existing drainage conditions and to determine storm 
drainage improvements that will be needed to accommodate the widening of Murrieta 
Road.

ENGINEER

HUNSAKER & ASSOCIATES,

Jul 2001Feb 2007

Responsible for providing civil engineering for land development projects. Civil design
includes: precise grading, street improvements, sewer & water improvements, and storm drain improvements for public and private facilities, residential and commercial
developments.
Project: LADERA RANCH TRACTS 16116, 16236, 16243, 16271
  • Designed and Prepared Storm Drain Improvements Plans, Prepared a
Hydrology and Hydraulics Report for a residential development

Project: CITY OF BUENA PARK, KNOTTS BERRY FARM
  • Designed and Prepared Storm Drain Improvements Plans, Precise Grading
Plans for roller coaster ride, the Silver Bullet
  • Designed Sewer and Grading plan for TGIF Restaurant

Project: CITY OF CALABASAS TRACTS 35596-16 thru 24
  • Designed and Prepared Street Improvements Plans, Sanitary Sewer Plans,
Precise Grading Plans for a residential development

Project: CITY OF IRVINE PA-9A & PA-9B
  • Designed and Prepared Storm Drain Improvements Plans, Precise Grading
Plans, Prepared Hydrology and Hydraulics Reports for a residential and commercial development

Project: CITY OF BEAUMONT TRACTS 31521-4 & -5
  • Designed and Prepared Storm Drain Improvements Plans, Prepared Hydrology and Hydraulics Report for a residential development

Project: CITY OF LAKE ELSINORE TRACTS 30698 & 32129
  • Designed and Prepared Storm Drain Improvements Plans, Prepared Hydrology and Hydraulics Report for a residential development
Project: CITY OF ONTARIO TRACT 17245
  • Designed and Prepared Storm Drain Improvements Plans, Prepared Hydrology and Hydraulics Report, Designed BMP measures for Water Quality in accordance with the San Bernardino County Stormwater Program for a
residential and commercial development

STAFF ENGINEER

PSOMAS,

Jan 1998Jul 2001

Project: ANAHEIM TECHNOLOGY CENTER- WAREHOUSE BUILDING #5
  • Designed grading, storm drain system and sewer system for the Anaheim Technology
Center, Warehouse Building #5

Project: PLAYA VISTA TRACT 52092
  • Designed and prepared the street improvement plans for a residential and commercial
development

Project: RESCO SELF STORAGE, LONG BEACH
  • Designed and prepared precise grading and drainage plans, water & sewer plans and horizontal control plans, Prepared Hydrology and Hydraulics Report for a commercial
development

Project: BROOKHURST STREET/ SR-91, FULLERTON
  • Prepared hydrology study and proposed storm drainage improvements to reduce
flooding

Project: SUNCAL FULLERTON
  • Prepared hydrology study for a 280 acre site draining to Brea Creek Channel.
Designed storm drain improvements based on hydrology study.

STUDENT ENGINEER

Port of Los Angeles, Los Angeles, CA

Jun 1995Jan 1998

Project: EVERGREEN CONTAINER TERMINAL REDEVELOPMENT
  • Responsible for researching the location of existing utilities: storm drain, water lines,
gas lines, sewer lines, and transferring data onto an AutoCAD information network.

Project: MANUAL YARD INTERMODAL TERMINAL SITE IMPROVEMENTS
  • Designed grading, paving and fencing plan for queuing area

Project: BERTHS 200 G-H STORM DRAINAGE
  • Designed storm drainage system to improve ponding conditions

Project: PIER 300 APL EXPANSION
  • Designed removals, grading and paving for APL's Container Terminal expansion at
Pier 300

Education

Bachelor of Science

University of California, Irvine, CA

1998

Additional Information

Computer Skills AutoCAD, WSPG, AES, CivilD & Storm Program, Microstation, Inroads, Haestad Methods, Flow Master, Softdesk, Power-Point, Microsoft Word, 
Word Perfect, Excel 
 
Special Skills Fluent in Spanish
Resume Builder | Resume Templates | Resume Examples | About Us | Privacy Policy | Terms of Use | Help Articles | Contact Us
Super-Resume.com © 2013-2017